- Callout
- £65
- EICR, 3-bed
- £170
- Usually here within
- 2 working days
- Emergency, out of hours
- £110
- Telephone
- 0161 496 0472
The board
Marlow Electrical is for:
Three kinds of call, and one document that answers most of them. Below the three is the circuit schedule off the board in the drawing — what a finished consumer unit says on the inside of its door.
The same ten ways as the board at the top of the page. Pick one — the drawing, this strip and the schedule all follow it. The strip runs on past the edge of the screen, as the board does.
| Way | Circuit | Protective device | Cable | Notes |
|---|---|---|---|---|
| 1 | Lighting, downstairson test | 6 A Type B RCBO | 1.5 mm² T&E | Ref. method C, clipped direct. Loop-in at the ceiling roses. |
| 2 | Lighting, upstairson test | 6 A Type B RCBO | 1.5 mm² T&E | Loft run, 100 mm above the insulation on the joists. |
| 3 | Sockets, downstairson test | 32 A Type B RCBO | 2.5 mm² T&E | Ring final. Continuity r1, rn, r2 recorded end to end. |
| 4 | Kitchen ringon test | 32 A Type B RCBO | 2.5 mm² T&E | Ring final. Zs 0.31 Ω measured at the furthest socket, against a limit of 1.37 Ω. |
| 5 | Sockets, upstairson test | 32 A Type B RCBO | 2.5 mm² T&E | Ring final. One spur, back bedroom, off a 13 A FCU. |
| 6 | Cookeron test | 32 A Type B RCBO | 6 mm² T&E | Radial to a 45 A cooker switch. Diversity applied to the load. |
| 7 | Garageon test | 20 A Type B RCBO | 2.5 mm² SWA | Sub-main to a two-way board in the garage. IR >299 MΩ. |
| 8 | Shower, 9.5 kWon test | 40 A Type B RCBO | 10 mm² T&E | Radial to a 45 A pull-cord isolator outside the zones. |
| 9 | EV charge point, 7 kWon test | 32 A Type B RCBO · RCD Type A + 6 mA DC | 6 mm² T&E | Own way. RCD 17.2 ms at 1×I∆n. PEN fault device in the charger. DNO notified. |
| 10 | Spare | blanked | — | Left for whatever comes next, so the next job does not need a new board. |
Every board I fit leaves with this schedule filled in, on the door, in pen. The next person to open it — me or anyone else — knows what every way feeds without switching things off to find out.
The schedule
What things cost, before you ring
Set out the way a circuit schedule is set out, because that is the document this trade already writes. Prices include the certificate and the parts named, nothing here is a “from” unless it says so, and the lead times are drawn to scale — one tick a working day, to the outside date.
Attending
Testing and certifying
Work
Tell me what you’re planningParking, congestion and waste are in the price. If a job turns out to be smaller than quoted you pay the smaller number, and if it turns out to be bigger I stop and tell you before I carry on — which is the whole of my pricing policy and about as long as one needs to be.
The report
The page of the EICR you keep
Numbered observations down the left, a code in a box on the right, and one word at the bottom that decides whether you owe anybody anything. Here is that page both ways round, on the same house.
Four codes. Two of them mean you have to do something. Two of them do not.
An EICR is an inspection, not a repair. It records the condition of an installation on the day it was looked at, and it ends in one word — satisfactory or unsatisfactory. That word is decided entirely by the right-hand column.
If you are a landlord in England, the report is required every five years and within 28 days of a new tenancy, and a copy goes to the tenant. If it comes back unsatisfactory you have 28 days, or less if the report says so, to get the work done and prove it.
the four codes, as the form prints them
- C1
- Danger present. Someone could be hurt now.
Exposed live parts, usually. This gets made safe before I leave the property, whatever the report says afterwards — and if I find one I will tell you standing in the room, not in an email the next day.
- C2
- Potentially dangerous. Fix it.
Nothing is going to bite you today, but the protection you are relying on is not there — no earthing to a circuit, say. C2 is the code that makes a report unsatisfactory, and it is the one that costs money.
- C3
- Improvement recommended. You do not have to do anything.
The installation is safe and complies with the standard it was built to; something newer would be better. A C3 does not make a report unsatisfactory and does not need remedial work. If anyone quotes you to “clear the C3s”, that is a sale, not a requirement.
- FI
- Further investigation required.
Something could not be reached or tested on the day and might be a problem. FI also makes a report unsatisfactory — so I tell you before I start where I expect to be unable to get to, rather than handing you a report full of them.
Electrical installation condition report
Observations and recommendations for action
- report
- example only
- installation
- three-bed house
- inspected and tested by
- D. Marlow
| Item | Location | Observation | Code |
|---|---|---|---|
| 1 | Consumer unit | No circuit chart or schedule at the origin | C3 |
| 2 | Landing | No RCD protection to the upstairs socket circuit | C3 |
| 3 | Bathroom | No supplementary bonding; every circuit at the origin is RCD protected | C3 |
| 1 | Kitchen | Damaged socket outlet, live parts accessible | C1 |
| 2 | Consumer unit | No main protective bonding to the gas service | C2 |
| 3 | Landing | No RCD protection to the upstairs socket circuit | C3 |
| 4 | Loft | Junction box not accessible for inspection | FI |
Comments on the installation Three observations, and all three are C3. Every one of them is an improvement rather than a defect. Nothing on this report needs doing and nothing on it needs paying for.
Comments on the installation Items 1 and 2 have to be put right and item 4 needs somebody to get at it. Item 3 is the same C3 that stands in the satisfactory report — it is not what changed the word at the bottom, and it is not part of the remedial work.
Overall assessment of the installation for continued use — delete as appropriate
satisfactoryunsatisfactory
Next inspection recommended within five years, or at change of occupancy, whichever comes first.
Remedial work required within 28 days of this report, or sooner where an item says so, with written confirmation to the tenant once it is done.
If you have a report from someone else and you cannot make sense of it, send me a photograph of the observations page. I will tell you what it says for nothing, including when it says you have been quoted for work you do not need. Send me the observations page
One van
Who turns up
The same person who answers the phone, quotes the job and signs the certificate. There is no office and there is nobody to be passed to.
If I have to open a wall, I will show you what is behind it before I close it up.
I’m Dean. Nineteen years in, eleven of them on my own after a decade with a contractor doing housing stock across Stockport — which is where you learn what forty years of other people’s alterations look like behind a socket.
I work to BS 7671:2018+A4:2026, the current wiring regulations, and I hold the City & Guilds 2382 for the regulations themselves and the 2391 for inspection and testing. The 2391 is the one that matters for an EICR and it is the one people forget to ask about.
Notifiable work is self-certified and registered with Building Control, which means your certificate arrives without you applying for anything. You should get it within five working days; if you have not, ring me, because it means something has gone wrong at my end.
Declaration
Every certificate ends with this block. Here is mine, filled in, so you can read it before you meet it.
Ring if it’s urgent. Write if it isn’t.
Is anything off, warm, smelling, or tripping right now?
Ring
0161 496 0472If it rings out I am under a floor. Leave it ringing, then leave a message — I return them at lunch and at six, every day, including the days I am not working.
- Turn the circuit off at the board if you can find it.
- Don’t reset a breaker that keeps tripping.
- If it’s smoke, it’s 999 first.
Marple, Marple Bridge, Romiley, Compstall, High Lane and Hawk Green — all SK6.